Trading & execution

Route a large swap without moving the price

Price a size-heavy swap across every connected venue, split it where the depth is, and cap the damage before you sign.

Experience
Starter
Read time
6 minutes
Available in
Chat, Voice
Updated
19 August 2026
Start the conversation
Your starting prompt

Swap 250,000 USDC into ETH on Base with no more than 0.3% slippage.

Request early access Copy the prompt, then make it your own.
See the workflow take shape
Pre-trade splitImpact 0.11%
250,000 USDC → ETH81.4192 ETH
Uniswap v4 62%Aerodrome 38%
Slippage Ceiling0.30% max

Example output · Figures are illustrative.

In this guide

What this covers

A quarter-million-dollar swap behaves nothing like a five-hundred-dollar one. Send it to a single pool and you pay for the privilege in price impact. This guide walks the workflow Maren uses to keep that cost down, and the two numbers worth checking before you approve.

Before you start

  • Funded balance on the source network.
  • A slippage figure you are comfortable with. If you have no strong view, 0.3% is a reasonable default for major pairs and 1% for thinner ones.

1. State the size and the ceiling in one sentence

Say the constraint out loud in the prompt rather than fixing it afterwards:

Prompt
Swap 250,000 USDC into ETH on Base with no more than 0.3% slippage.

Maren treats the ceiling as policy, not preference. If no route can fill inside it, you get a rejection and an explanation instead of a bad fill.

2. Read the route split

The confirmation names each venue and its share. A split across two or three pools is normal and usually cheaper than any single one:

VenueShareReason
Uniswap v462%Deepest USDC/ETH tick range on Base
Aerodrome38%Absorbs the remainder without crossing a gap

If a single venue takes the whole order, that is fine too. It means nothing else improved the price after fees.

3. Check price impact against slippage

These are different numbers and people conflate them constantly.

  • Price impact is what your own order does to the pool. It is a prediction.
  • Slippage cap is how much worse than the quote you will tolerate before the transaction reverts. It is a limit.

Impact well under your cap is the healthy case. Impact pressed up against it means you are about to pay near the maximum you authorised.

Impact at or above 1% on a major pair is a signal to split the order over time rather than force it through. See Ladder into a position with TWAP.

4. Approve

Approving signs the exact amount quoted. Maren re-prices in the same instant and aborts if the market has moved beyond your cap, so an approval cannot be replayed against a worse book.

Tips

  • Name the network in the prompt. It removes an entire clarification round trip.
  • Ask "why that route?" and Maren returns the losing quotes it discarded.
  • For repeat swaps, describe the rule once and let it stand rather than retyping it.

Troubleshooting

"No route inside your slippage cap." Depth moved. Either raise the cap deliberately or reduce the size.

Quote expired before approval. Volatile pairs re-price in seconds. Re-ask; do not raise the cap to work around it.

The controls behind this workflow

  • Order is rejected outright if the quoted price impact exceeds your cap.
  • Quotes are re-priced immediately before signing; a stale quote aborts.
  • Approvals are scoped to the exact amount, never unlimited.

Guides describe how to operate Maren. They are not financial advice, and figures shown are illustrative. You approve every transaction before it is signed.